Infrastructure

PROJECT EXPERIENCE

We at Rosewood have duly laid around 20000 km of underground utilities which consists of HDPE Pipes, Electricity Cables, Copper Cables, PIGF Cables, Gas Pipes, Sewer Pipes & Water Pipelines.

We have crossed several canals in the state of Haryana; we have duly laid underground utilities along the road as well as the railway/road crossings in several states of India.

FLEET OF MACHINES

  • Drillto ZT 18 (HDD Machine having 18 Ton Pull Back Along With Tools And Shackles)
  • Drillto ZT 25 (HDD Machine having 25 Ton Pull Back Along With Tools And Shackles)
  • Drillto ZT 25 D (HDD Machine having 25 Ton Pull Back Along With Tools And Shackles)
  • Drillto ZT 35 F (HDD Machine having 35 Ton Pull Back Along With Tools And Shackles)
  • Drillto ZT 10 (HDD Machine having 10 Ton Pull Back Along With Tools And Shackles)
  • Drillto ZT 60 (HDD Machine having 60 Ton Pull Back Along With Tools And Shackles)
  • Drillto ZT 150 (HDD Machine having 150 Ton Pull Back Along With Tools And Shackles)
  • Drillto ZT 160 (HDD Machine having 160 Ton Pull Back Along With Tools And Shackles)
  • 2 Mud Mixer Tank (Original Imported With HDD Machine)
  • Mud Disposal Tank with Suction Pump & Engine.
  • 2 Water Tankers and 1 Water Tanker Mounted On Tata 1620 LP Truck
  • Generator Engine For Site (2.5 KVA)
  • Tata Truck 2515 TC EX & 1109 (1 Container)
  • Tata Truck 1613 LPT 48 TC (4 Containers)
  • Water Tanker Tractor Pulled (5000- 6000 Litres)
  • 2 Site Vehicle MUV
  • Tractors
  • Trolley for Shifting Of Ducts & Materials.